Papua New Guinea Catheter Connector

After the sealing tube is connected to the fitting, close the through hole at the front end of the tube, and apply a water pressure of 300kPa to the conical hole of the fitting for 30s.

Product Description

Product features:
1. After the pipe is connected with the joint, apply 5N axial pulling force for 5s.
2. After the sealing pipe is connected with the joint, the through hole at the front end of the pipe is closed, and a water pressure of 300kPa is applied to the conical hole of the joint for 30s.
xinghua

Consult Now

Submit